48 & 60 Die & Cool Plug Installation
What: A checklist to install the die and cool plug for 48” & 60”
When: During diameter change
Why Use: To create a consistent process that covers necessary checks to ensure a speedy start-up
Keys: Install new gaskets & O-rings at every diameter change
Installation Steps
Specific Notes for the 48 and 60”
- When you go back to 60 you have to extend the carriers by putting the long blocks back in place on the take up end of the corrugator after removing the shorter ones.
- Then add one carrier top and bottom.
