Corrugator Start-up Procedure

START UP:

Step 1

Remove the Temporary Heaters and start purging always inside material Extruder first then the outer material extruder, make sure plastic is flowing well all around and you do not have cold spots on the calipers. Always monitor the Melt pressure to not exceed the target pressure (see past run sheets to find the target pressure)

Step 2

Clean the Die and Calipers thoroughly using coper or brass tools, this is a very important step on this process if you see any damages on the calipers report it to maintenance team immediately so they can carry out the repair process on the calipers. Apply Generous amount of silicon spray on all metal surfaces and cooling plug all around the calipers. (SEE PICTURE BELOW)